▶ Dual Delegation Insight
We were honored to host engineers from Woh Hup (Private) Limited and a 15-member delegation from Hwa Seng Builder Pte Ltd at our Shanghai high-speed rail project. Both teams observed 700-ton box girder operations – gaining firsthand insights into our advanced construction methodologies.
▶ Engineering Excellence Showcased
• For Woh Hup: Detailed observation of the full 700t girder launching process, with special recognition of our equipment efficiency and operational precision.
• For Hwa Seng Builder: Witnessed the installation of a 700-ton girder in 45 minutes – setting a new industry benchmark through cutting-edge technology and seamless teamwork.
▶ Global Partnerships Strengthened
These visits reinforce our shared commitment to:
✅ Advancing construction speed and safety
✅ Innovative infrastructure development
✅ Cross-border knowledge exchangeAs stated by Hwa Seng Builder: "A testament to precision engineering!" We extend gratitude to both teams for their collaboration in elevating global engineering standards.
Building bridges across borders – literally and figuratively!
Contact: Ren Binqing
Phone: +86 310 4022830
E-mail: renbinqing@vip.163.com;mark@hcrbridge.com
Add: No 2 ZhanBei Road, FuXing District, Handan City HeBei Province, P.C. 056003, CHINA